Tue 6 Oct 2026 · Legacy zones Hull and East Riding
locked
Locked: date, vehicle and stop order fixed. Never moved automatically.
Proposed
→Confirmed
→Locked
→Completed
Not synced
Simulated: no Track-POD connection. A sync records locally what would be sent.
Vehicle
Luton van VH-LUTON
Demo assumption: typical Luton box van.
Volume
1.85 / 19 m³
9.8% of usable Within volume
Stops
1 of 6
Planned order by area, not mileage-optimised.
Route volumeWithin volume · 9.8%
1.85 of 19 m³ (9.8%)
Over 80% of usable m³: manual loading check needed, can still be planned. Over 100%: cannot be assigned or confirmed. Volume is total packed m³ against the vehicle's usable m³. It is not a loading plan: sofas can be turned as the crew needs and drop order matters, so staying within 100% does not prove the crew can load it.
QC failure and rework: VB-10388 Historical example scenario. Seat cushion seam failed QC on Fri 2 Oct. 25 min sewing rework plus re-inspection. Delivery on Tue 6 Oct at risk.
Delivery at risk: VB-10388 on locked route Tue 6 Oct Rework and re-inspection must finish today to keep the locked Hull route. Customer notification via Track-POD is simulated.
Unscheduled: VB-10388 (QC) Ready-by already passed. Ready-by 2026-10-02 is before today. 2 operations not placed. Ready by 2026-10-02, delivery 2026-10-06 (protected route, not moved). No dates were changed.