Planning assumptions

Production planning

A1
New customer orders only. Each order stores its deliver-by when taken, so existing promises never change. Not a plan input.
A9
New Shopify imports only, capped so delivery can still meet deliver-by. Existing ready-by dates never change. Not a plan input.
A2
When proposing, keeps steps the accepted plan started within this many working days, if they still fit real availability. Marks the accepted plan out of date.
A3
A step may start this many working days after the step before it finishes. 0 allows the same day. Marks the accepted plan out of date.
A4
A limit, not a wait: QC may be no earlier than delivery minus this. Jobs whose window becomes impossible are reported unscheduled; dates are never moved. Marks the accepted plan out of date.
A6
Management reference shown on Overview. Not used by the plan.

Managed elsewhere

  • A5
    Each person's week and dated days
    17 people. Weekly totals: 2250 min (17). One shared pool per person across departments.
    Edit on People and capacity
  • C1
    Packed volume per base product
    Zen corner 0.71 m³ from dimensions; Zen armless 0.55 m³ from dimensions; Zen footstool 0.25 m³ from dimensions; Aura corner 0.58 m³ from dimensions; Aura armless 0.47 m³ from dimensions; Aura footstool Volume not known (width missing); 7th Heaven Maxi 3 Seater 1.85 m³ from dimensions; Fusion 3 Seater 1.58 m³ from dimensions; Serenity 3 Seater 1.80 m³ from dimensions
    Edit on Base products
  • Runs
    Delivery areas by postcode
    9 active runs decide which orders a route can serve.
    Edit on Runs

Vehicles (B2, C2)

All vehicle details

Usable volume is the vehicle volume limit; max stops caps each route. Saving recalculates load checks. Routes already over a new limit are flagged, not moved.

Luton van
7.5 t box lorry

Transport

B4
C8

Route time estimate

Used only for the approximate route time on each route page (straight-line distance, not road routing). Never changes dates, load checks or the plan.

C3
C4
C5
C6
C7
C9Depot (start and end of every route estimate and map)
A full UK postcode is required. Latitude and longitude place the depot on route maps.

Fixed rules (not settings)

  • A delivery route must be on or before the order's stored deliver-by. Deliver-by is never moved.
  • Planning and routes use Monday to Friday only; weekend capacity is not supported.
  • A route over 100% of the vehicle's usable m³ cannot be assigned, confirmed or proposed.
  • One active route per vehicle per day.
  • A route more than A4 (2) working days after ready-by is rejected. Ready-by is never moved to make a route fit.
  • One person works each unfinished step; cross-trained people share one daily pool, never added twice.