Vale BridgecraftBridgecraft OS
OperatorDemo dataDemo date Mon 5 Oct 2026 (fixed)

Exceptions

highUnmapped variant

Unmapped variant: Serenity - 3 Seater Sofa, Luxe Woven Velvet / Paprika

Shopify SKU zl0013653 on VB-10421 (1 unit) has no production product. No job or route exists until a person maps it. The system will not guess.

highQC failureFri 2 Oct

QC failure and rework: VB-10388

Historical example scenario. Seat cushion seam failed QC on Fri 2 Oct. 25 min sewing rework plus re-inspection. Delivery on Tue 6 Oct at risk.

mediumMaterialMon 5 Oct

Frame assembly blocked: webbing not in

Operator reported Material issue on VB-10399 Fusion 3 Seater. Upholstery tomorrow depends on this frame.

mediumDelivery riskTue 6 Oct

Delivery at risk: VB-10388 on locked route Tue 6 Oct

Rework and re-inspection must finish today to keep the locked Hull route. Customer notification via Track-POD is simulated.

lowSequence conflict in draft plan

Sequence conflict in draft plan: 28 jobs

The next step starts at least 1 working day after the step it needs. The incoming draft puts some dependent steps closer to the step they need than that (for example QC too soon after upholstery). Affects VB-10388, VB-10395, VB-10399, VB-10402, VB-10404, VB-10406, VB-10407, VB-10409 and 6 more. The computed plan follows the rule; the draft is left unchanged.

highAccepted plan: unscheduled

Unscheduled: VB-10388 (QC)

Ready-by already passed. Ready-by 2026-10-02 is before today. 2 operations not placed. Ready by 2026-10-02, delivery 2026-10-06 (protected route, not moved). No dates were changed.

highAccepted plan: unscheduled

Unscheduled: VB-10395 (UPHOLSTER)

No capacity in window. No working day left: must start on or after 2026-10-05 (predecessor plus 1 working day gap, or today) but finish by 2026-10-02. 3 operations not placed. Ready by 2026-10-05, delivery 2026-10-07 (protected route, not moved). No dates were changed.

highAccepted plan: unscheduled

Unscheduled: VB-10399 (FRAME_ASSY)

Blocked by reported issue. Operation is blocked by a reported issue. Not planned until it is cleared. 6 operations not placed. Ready by 2026-10-06, delivery 2026-10-08 (protected route, not moved). No dates were changed.

highAccepted plan: unscheduled

Unscheduled: VB-10402 (FRAME_COMP)

No capacity in window. No working day left: must start on or after 2026-10-05 (predecessor plus 1 working day gap, or today) but finish by 2026-10-02. 8 operations not placed. Ready by 2026-10-07, delivery 2026-10-09 (protected route, not moved). No dates were changed.

highAccepted plan: unscheduled

Unscheduled: VB-10402 (FRAME_COMP)

No capacity in window. No working day left: must start on or after 2026-10-05 (predecessor plus 1 working day gap, or today) but finish by 2026-10-02. 8 operations not placed. Ready by 2026-10-07, delivery 2026-10-09 (protected route, not moved). No dates were changed.

highAccepted plan: unscheduled

Unscheduled: VB-10402 (FRAME_COMP)

No capacity in window. No working day left: must start on or after 2026-10-05 (predecessor plus 1 working day gap, or today) but finish by 2026-10-02. 8 operations not placed. Ready by 2026-10-07, delivery 2026-10-09 (protected route, not moved). No dates were changed.