Locked: date, vehicle and stop order fixed. Never moved automatically.
Proposed
→Confirmed
→Locked
→Completed
Not synced
Simulated: no Track-POD connection. A sync records locally what would be sent.
Vehicle
Luton van VH-LUTON
Demo assumption: typical Luton box van.
Volume
1.58 / 19 m³
8.3% of usable Within volume
Stops
1 of 6
Planned order by area, not mileage-optimised.
Route volumeWithin volume · 8.3%
1.58 of 19 m³ (8.3%)
Over 80% of usable m³: manual loading check needed, can still be planned. Over 100%: cannot be assigned or confirmed. Volume is total packed m³ against the vehicle's usable m³. It is not a loading plan: sofas can be turned as the crew needs and drop order matters, so staying within 100% does not prove the crew can load it.
Frame assembly blocked: webbing not in Operator reported Material issue on VB-10399 Fusion 3 Seater. Upholstery tomorrow depends on this frame.
Unscheduled: VB-10399 (FRAME_ASSY) Blocked by reported issue. Operation is blocked by a reported issue. Not planned until it is cleared. 6 operations not placed. Ready by 2026-10-06, delivery 2026-10-08 (protected route, not moved). No dates were changed.