Vale BridgecraftBridgecraft OS
OperatorDemo dataDemo date Mon 5 Oct 2026 (fixed)

Replan workspace

Planning overview

New work awaiting planning: days over capacity (0)

Next 10 working days

These are shortfalls in provisional days, including new work, not problems in the accepted plan. Choose a day to inspect its jobs.

  • No draft days exceed available capacity in this period.

Selected draft day

None

No draft overload to inspect. You can still prepare a proposal for the whole workload.

Accepted plan: Version 1 (current). Jobs unplaced in an accepted plan are separate from draft-day shortages.

Local what-if inputs

Nothing is written until Accept

Manual trials are optional. With none entered, the proposal uses normal/current capacity. You do not need one adjustment per draft overload.

Named person-day capacity
min

Overtime is one extra pool for that person across all their skills, capped at 90 min (A8). Absence cannot remove hours booked for work under way or inside the freeze horizon.

Job priority

Raised jobs are placed before others. Locked and confirmed deliveries still come first, and work under way or frozen is never moved.

Current what-if adjustments (separate from the blank entry fields)

None. The proposal uses people's normal calendars.

    Prepare proposal replans the whole workload across the planning horizon, not just the focused draft cell. Review what remains unplaced before accepting.

    How the proposed schedule is worked out

    What it never changes

    Order ready-by dates, customer deliver-by promises and delivery dates stay the same. The proposal only assigns production steps to people and working days. It cannot invent extra working time to hide a shortage.

    Order in which jobs are placed

    1. Jobs for orders on locked delivery routes
    2. Then jobs on confirmed routes
    3. Then jobs Rob has raised in priority
    4. Then earlier ready-by, then order number

    An order on a locked or confirmed route takes priority. Raising another job can leave less time for other orders, even ones due earlier. Review the named jobs that still cannot be placed.

    How each job is placed

    Work already in progress stays with the same person. Near-term assignments in the accepted plan stay in place. Starting from the quality-check ready-by date, the system works backwards through the required steps. It checks who can do each job and counts each person's available working minutes only once, even if they have several skills. The next step starts at least 1 working day after the step it needs. (gap between steps, set on Assumptions as A3); finished goods can only wait for a limited time.

    When it cannot fit

    If a required step cannot fit, the job and its remaining steps stay unplaced. The proposal names each job, its reason and its ready-by date. You must acknowledge those jobs before accepting. No delivery date moves to make the work fit.

    Limits

    This is a practical rule-based proposal, not a guarantee of the best possible schedule. Production works towards its ready-by date. The customer's deliver-by promise is checked when a delivery route is assigned in Transport, not by production planning.

    What stays in place

    Work already under way
    Stays with the same person.
    Near-term accepted work
    Existing assignments stay in place.
    Locked and confirmed deliveries
    Their orders take priority; delivery dates do not move.
    Each person's available time
    Counted once, even across several skills.